Bitumen 60/70 vs 70/100: How to Specify Your Wholesale Order
Choosing between 60/70 and 70/100 bitumen starts with the project specification, not the grade name alone. This guide helps procurement teams compare technical requirements, packaging and quotation terms.
What 60/70 and 70/100 Mean for Bitumen Buyers
The numbers in a penetration grade describe how far a standard needle penetrates a bitumen sample under controlled test conditions. For buyers comparing bitumen 60/70 vs 70/100, they indicate binder consistency at a specified test temperature—not a temperature range for storage, application or road service.
Understanding penetration at 25°C
Penetration is measured at 25°C and reported in dmm, meaning tenths of a millimetre. One dmm equals 0.1 mm. The test uses a prescribed needle, load and duration so that results can be compared under the same conditions.
| Listed grade | Penetration at 25°C | Equivalent needle penetration |
|---|---|---|
| Penetration Grade Bitumen 60/70 | 60–70 dmm | 6.0–7.0 mm |
| Penetration Grade Bitumen 70/100 | 70–100 dmm | 7.0–10.0 mm |
A lower penetration value means the needle travels less deeply into the sample, indicating a harder binder at that test temperature. This is why 60/70 is described as harder than 70/100 under the same test conditions. The ranges meet at 70 dmm, however, so the grade names should not be read as two completely separate bands of hardness.
Both listed products are unmodified paving bitumen. Their penetration designations do not indicate polymer modification, nor do they establish every property needed for a project. Penetration is one specification parameter; it does not, by itself, describe performance across all pavement temperatures or loading conditions.
Select against the project specification
The listed 60/70 product is intended for applications including hot-climate asphalt concrete and heavy-duty pavements. The listed 70/100 product includes hot-mix asphalt, surface dressing and chip seal applications in temperate and moderate-climate road programmes. These application descriptions provide context, not permission to substitute one grade for another.
Grade selection must follow the project specification and engineer approval, rather than climate alone. Traffic loading, pavement design, asphalt mix requirements and the applicable binder standard can all affect suitability.
For procurement purposes, record the required penetration grade together with the governing standard and any project-specific acceptance requirements. If an alternative grade is proposed, treat it as a technical substitution requiring approval—not simply an equivalent wholesale product.
Compare the Technical Requirements Before Selecting a Grade
A bitumen 60/70 vs 70/100 comparison should begin with the project’s binder specification, not the grade name alone. Both products are unmodified paving bitumen, but their stated penetration, softening point and flash point requirements differ. These differences matter when assessing suitability for the intended mix, pavement duty and operating environment.
| Technical requirement | Bitumen 60/70 | Bitumen 70/100 |
|---|---|---|
| Penetration at 25°C | 60–70 dmm | 70–100 dmm |
| Softening point (Ring and Ball) | 49–56 °C | 43–51 °C |
| Ductility at 25°C | ≥ 100 cm | ≥ 100 cm |
| Solubility in trichloroethylene | ≥ 99.0% | ≥ 99.0% |
| Loss on heating | ≤ 0.2% | ≤ 0.2% |
| Flash point (Cleveland open cup) | ≥ 250 °C | ≥ 230 °C |
Lower penetration indicates a harder binder under the stated test conditions. The higher softening point range for 60/70 is another relevant distinction, but neither measurement alone establishes pavement performance. Flash point is a safety-related characteristic, not a recommended mixing or storage temperature.
Match the stated applications to the project
Bitumen 60/70 is described for hot-climate asphalt concrete, heavy-duty pavements and high axle-load road construction. Its stated applications also include airport and port hardstanding, asphalt plant binder supply and industrial waterproofing. For these purchases, the buying brief should identify the specified binder grade, loading conditions and any project-specific acceptance criteria.
Bitumen 70/100 is described for hot-mix asphalt, surface dressing and chip seal work in temperate and moderate climates. Other stated applications include base and binder courses, rehabilitation overlays and bituminous waterproofing membranes. These uses provide selection context; they do not establish suitability for every mix design or installation method.
Resolve specification gaps before approval
The shared ductility, solubility and loss-on-heating limits do not make the grades interchangeable. Any proposed substitution should be reviewed against the project specification and approved through the buyer’s engineering process.
The procurement specification should identify the governing standard and edition, required test methods and acceptance limits. The figures above are supplied product specifications, not batch laboratory results or evidence of compliance with an unnamed standard. Any additional technical requirement or document detail not stated here is confirmed on the quotation.
Specify Packaging, Quantity and Container Requirements
When comparing bitumen 60/70 vs 70/100, separate grade selection from the packing specification. Both 60/70 penetration grade bitumen and 70/100 penetration grade bitumen share the following packaging options:
| Packaging format | Stated net quantity |
|---|---|
| New steel drums | 180 kg per drum |
| New steel drums | 200 kg per drum |
| Bulk bitutainer | 20–24 t |
State the preferred format explicitly in the buying brief. “Drummed bitumen” alone does not distinguish between the two drum sizes, while a bulk requirement should identify the intended tonnage and the receiving facility’s handling constraints.
Distinguish the minimum order from the final load
The stated minimum order for both grades is one 20ft container, approximately 20 t drummed. This is an order-planning reference, not a guaranteed loading schedule or an exact shipment weight.
Do not calculate a definitive drum count by dividing approximately 20 t by the nominal drum fill. Likewise, a 20ft container designation does not establish its usable payload or prove that a particular drum arrangement is suitable. In general, container payload limits, packaging tare, securing arrangements and applicable transport restrictions all affect load planning.
The final drum count, net and gross weights, and loading configuration must be confirmed on the quotation. For bulk bitutainers, the exact net quantity and equipment arrangement must also be confirmed on the quotation; the stated 20–24 t option should not be treated as a fixed shipment weight.
Record the receiving and handling requirements
A practical packing brief should include:
- Selected grade and total required net tonnage.
- Preferred 180 kg or 200 kg net drums, or bulk bitutainer format.
- Requested number of containers, distinguishing this from the required product tonnage.
- Destination handling restrictions and available unloading equipment.
- Any required palletisation, marking or load-securing arrangements, with acceptance confirmed on the quotation.
Keep product net weight separate from packaging and transport-equipment tare. The quotation should make the basis of each gross-weight figure clear, including whether it refers to packed cargo or the loaded transport unit. This avoids treating the approximate drummed minimum order as a confirmed payload.
Review Export Documents and Incoterm Responsibilities
When assessing bitumen 60/70 vs 70/100, check the paperwork alongside the grade specification. The following documents are specified for both Penetration Grade Bitumen 60/70 and Penetration Grade Bitumen 70/100:
- Commercial Invoice: records the parties, goods description and commercial transaction details for customs purposes.
- Packing List: identifies package counts, packaging types and net and gross weights for shipment reconciliation.
- Bill of Lading: records receipt or loading of goods for sea carriage; its release arrangements should match the agreed payment and shipping terms.
- Certificate of Origin: states the goods’ origin. Any preferential-origin claim requires the applicable supporting evidence.
- Certificate of Analysis: provides analytical results to review against the agreed grade requirements; it should identify the relevant batch or lot.
- Technical Data Sheet: sets out technical product information for specification review.
- Safety Data Sheet: provides hazard, handling, storage and emergency-response information.
Document issuers, formats, batch references and any legalisation requirements are confirmed on the quotation. A document list alone does not establish compliance with a particular destination’s import rules.
Allocate costs and risk explicitly
Both products specify EXW, FOB, CFR and CIF. Write the selected rule with its named place or port and edition, for example, “FOB [named port of shipment], Incoterms® 2020”.
- EXW — named place: the seller makes the goods available, normally without loading the collecting vehicle or clearing export customs. The buyer generally arranges collection, export clearance and onward carriage; risk transfers when the goods are placed at the buyer’s disposal.
- FOB — named port of shipment: the seller clears the goods for export and delivers them on board the buyer-nominated vessel. Risk transfers on board; the buyer arranges and pays the main freight.
- CFR — named port of destination: the seller pays freight to that port, but risk transfers when the goods are on board at the shipment port.
- CIF — named port of destination: the CFR allocation applies, with the seller also arranging the required minimum cargo insurance. Freight and insurance payment do not postpone risk transfer until arrival.
FOB, CFR and CIF apply to sea or inland-waterway transport. Check container handover arrangements, unloading and destination charges explicitly. Destination-specific documentation, import clearance and regulatory requirements should be checked with the buyer’s customs broker.
Request a Written Bitumen Quotation with a Complete Buying Brief
Turn your bitumen 60/70 vs 70/100 assessment into a clear purchasing brief before requesting a quotation. State the grade approved by your project engineer or purchasing specification rather than asking the supplier to select it from climate or application alone.
Send your enquiry to AFRI GENERAL TRADING SOLUTION (PTY) LTD, a supplier and trading company based in Kimberley, South Africa, exporting bulk commodities. The company operates on a quotation-only basis; final supply details are confirmed on the quotation.
Include These Details in Your Enquiry
- Approved grade: Identify either Penetration Grade Bitumen 60/70 or Penetration Grade Bitumen 70/100. Note any restrictions on grade substitution.
- Required specification: Attach the applicable project specification, standard and edition, acceptance limits and test methods. Include any purchaser approval or inspection requirements so these can be reviewed before quotation.
- Quantity: State the total net tonnage and proposed container count. Both grades have a minimum order quantity of one 20ft container, approximately 20 tonnes when drummed. Final loading details are confirmed on the quotation.
- Packaging: Specify new steel drums of 180 kg or 200 kg net, or a bulk bitutainer of 20–24 tonnes. Jumbo polyamide bags are an on-request option for 70/100 only. Include any handling, marking or container restrictions.
- Destination: Provide the destination country, discharge port and final receiving address where relevant. Flag import restrictions or site unloading requirements.
- Incoterm and named location: Request EXW, FOB, CFR or CIF with the precise named place or port and the applicable Incoterms edition. Avoid writing only “FOB” or “CIF” without a location.
- Documents: List required commercial invoice, packing list, bill of lading, certificate of origin, certificate of analysis, technical data sheet and safety data sheet. Specify any additional destination requirements, original-document needs or legalisation instructions for review.
- Requested shipment window: Give your preferred shipment dates and distinguish them from any required arrival date. These are planning requirements, not a delivery commitment; shipment arrangements are confirmed on the quotation.
Include your company details and procurement contact, then check the written quotation against your approved brief before proceeding.
Request a Wholesale Quote with your complete buying requirements.
Frequently asked questions
Can I replace 70/100 bitumen with 60/70?
Not without checking the project specification and obtaining engineer approval. The grades have different penetration and softening point ranges, so substitution requires technical assessment.
What is the minimum order for these penetration grades?
Both products have a stated minimum order of one 20ft container, approximately 20 t drummed. Final loading details and order configuration are confirmed on the quotation.
Which documents should I request to review the bitumen specification?
Request the Technical Data Sheet, Certificate of Analysis and Safety Data Sheet. Check the technical information against your project requirements; document scope and any additional testing requirements are confirmed on the quotation.
What should I include in a wholesale bitumen quotation request?
Include the grade, project specification, quantity, packaging preference, destination, Incoterm with named place or port, required documents and requested shipment window. Request a written quotation confirming the proposed supply terms.